Solar panel installation testimonials

Mr and Mrs McVeigh from Pyrford, Surrey

I have been very happy with the overall service provided by Solar Strategies I am now benefiting from my own energy generation. A pleasure to work with from start to finish, factual information, no sales talk, competitive price and prompt installation. All interactions have been friendly, through to the installation team and handover, really knew what they were doing, pleasant and positive manner. Recommended.

 

Mr and Mrs W from Biggleswade, Bedfordshire

We appreciated that everything was carried out to the stated timetable. The people were pleasant and took time to explain everything. Paperwork etc arrived when they said it would. Liked the fact that the house was cleaned up immaculately afterwards. Would recommend company to others.

 

Solar Panels East Molesey, Hampton Court, Surrey

Mr B approached us at the end of 2012. He had an East/West facing roof with no shading. The survey concluded that there was not sufficient space on the east facing roof to split the panels equally. We therefore suggested that he use both East, West and the Smaller South Facing roofs. An SMA string inverter has a maximum of 2 MPP trackers which means the inverter can cope with 2 different orientations, but Mr B had 3. We opted to use Enecsys micro inverters with the Enecsys on-line monitoring. Each of the panels has its own inverter making the system very efficient. With the online monitoring the client and solar strategies can track the systems performance... Read about the project.

 

Mr M from Camberley

I had a number of quotes based on the same size of system, therefore I was sure that solar strategies quote was very competitive. As soon as I accepted the contract and paid my deposit, a well- oiled machine kicked into action. I was given an installation timetable and everyone turned up on time. I was very impressed. The installers were personable and very helpful. On completion I was given a full brief on the workings of the system. I would have no hesitation in recommending Solar Strategies to anyone else contemplating a PV system.

 

Mr and Mrs C from Guildford

The installation was carried out swiftly and tidily. The system appears to be performing as expected - just waiting for a bit more of a sunny spell to see the real benefit.

 

Mr and Mrs Z from Gosport

We are extremely satisfied by the solar panel installation provided by solar strategies. The job has been properly done. We were thoroughly informed and the response was prompt whenever we had any questions and enquires. With so many disappointments from big boys for different services Solar Strategies looked after its customer very well. Well done and maintain the quality workmanship.

 

Mr A from Maidenhead

Mr A came to Solar Strategies with a new build Hauf House project. The client had a large flat roof and wanted to maximise the space with generating electricity from Solar Panels. We designed a bespoke 10.0kW system using a ballasted flat panel array. A 3 phase SMA Tri-power was fitted to maximise generation. With 40 x Panels Mr A will be generating most of his domestic electrical needs.

 

Mr and Mrs S from Yateley

A job well done, with personal hands on service. Everything done as per specification and schedule. No hesitation in recommending your service to friends and family.

 

Mr and Mrs Paxton from Crowthorne, Berkshire

We were very pleased with all the information given to us both before and during the installation of the solar panels. The work was done very efficiently and unobtrusively. We would definitely recommend your company.

 

Mr and Mrs B from Whitchurch, Hampshire

First class service from Jon Copeland and his team, who offered the most competitive price. Jon was most knowledgeable and answered all questions honestly. Solar Strategies had already installed 3 systems in the road and these customers also confirmed the same level of service.

 

Bob & Carol from Isle of Wight

Thank you for sending us the installation photos, they are excellent. Your service is second to none. We are really pleased with the set up, and despite a predominantly cloudy day, we generated 14KWh today, and our normal meter only registered 1.15 units between 08.30 and 18.00, despite using the dishwasher, breadmaker, showers, hob and normal minor appliances. Not bad at all. We hope that we will be able to recommend you to other neighbours and friends.

 

Sarah from Fleet, Hampshire

Solar strategies really do take pride in their work and give a great service. The system and installation were fully explained at the beginning and any further queries were dealt with in a prompt and professional manner. The actual installation was carried out smoothly and effectively by a very efficient team with a minimum of disturbance. The results so far with the equipment have been excellent!

 

Receive a quotation

To receive a solar panel installation quotation simply add your postcode below and follow the on-screen instructions.

Find out if your property is suitable now...

Request a free quotation

Get an accurate email quote emailed to you directly...Fill in the following form and we will contact you within 24 working hours.

Send request

Solar Strategies guarantee

  •  The most competitive quote
  •  We guarantee a payback
  •  Knowledgeable people
  •  Tax free solar returns

Feed in tariffs

Feed-In Tariffs  (also known as FITs) are the electricity part of what some people call Clean Energy Cashback, a scheme that pays people for creating their own "green electricity". Read more.

Solar panels Surrey, Hampshire and Berkshire

Installation testimonials

Solar panels installations in Surrey, Hampshire and Berkshire

Solar Panel Installation in Camberley, Surrey
View testimonials

+ Sitemap