Current Solar Panel Offer

£5,999 for a 4kW system

Our current solar panel offer system is based on 16 Canadian Solar 250W panels and an SMA Inverter.

Example

Property in GU16 7QR facing south with a 30 degree roof with no shading.

  • Total Kilowatts Generated per Annum = 3433.60 (using sap2009)
  • Assumed 50% savings on electric bill = £257.52
  • Assumed 50% export to Grid = £77.26
  • Feed in Tariff @15.44p = £530.15
  • Total = £864.92

Price of investment Total = £5,999 1st years Return of Investment 13.31%!

Pay for your solar panel system within 6 Years!

Receive your free EPC level certificate on purchase of every system.

 

Receive a quotation

To receive a solar panel installation quotation simply add your postcode below and follow the on-screen instructions.

Find out if your property is suitable now...

Solar Strategies guarantee

  •  The most competitive quote
  •  We guarantee a payback
  •  Knowledgeable people
  •  Tax free solar returns

Feed in tariffs

Feed-In Tariffs  (also known as FITs) are the electricity part of what some people call Clean Energy Cashback, a scheme that pays people for creating their own "green electricity". Read more.

Solar panels Surrey, Hampshire and Berkshire

Installation testimonials

Solar panels installations in Surrey, Hampshire and Berkshire

Solar Panel Installation in Camberley, Surrey
View testimonials

+ Sitemap